<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:georss="http://www.georss.org/georss" xmlns:geo="http://www.w3.org/2003/01/geo/wgs84_pos#" xmlns:media="http://search.yahoo.com/mrss/"
		>
<channel>
	<title>Comments on: San Tomas Aquino Creek Trail, Reach 3, Open</title>
	<atom:link href="http://rayhosler.wordpress.com/2009/06/12/san-tomas-aquino-creek-trail-reach-3-open/feed/" rel="self" type="application/rss+xml" />
	<link>http://rayhosler.wordpress.com/2009/06/12/san-tomas-aquino-creek-trail-reach-3-open/</link>
	<description>One rider&#039;s observations and opinions</description>
	<lastBuildDate>Sun, 12 May 2013 01:47:10 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.com/</generator>
	<item>
		<title>By: Commuting in the Silicon Valley Triangle &#171; Silicon Valley Cyclist</title>
		<link>http://rayhosler.wordpress.com/2009/06/12/san-tomas-aquino-creek-trail-reach-3-open/#comment-373</link>
		<dc:creator><![CDATA[Commuting in the Silicon Valley Triangle &#171; Silicon Valley Cyclist]]></dc:creator>
		<pubDate>Tue, 09 Nov 2010 16:27:59 +0000</pubDate>
		<guid isPermaLink="false">http://rayhosler.wordpress.com/?p=364#comment-373</guid>
		<description><![CDATA[[...] San Tomas Aquino path is paved north of Monroe Street in Santa Clara, going under all major streets and highways. Just beyond 237 it links up with the Sunnyvale Baylands 237 frontage road and the paved trail to Alviso. [...]]]></description>
		<content:encoded><![CDATA[<p>[...] San Tomas Aquino path is paved north of Monroe Street in Santa Clara, going under all major streets and highways. Just beyond 237 it links up with the Sunnyvale Baylands 237 frontage road and the paved trail to Alviso. [...]</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Ray Hosler</title>
		<link>http://rayhosler.wordpress.com/2009/06/12/san-tomas-aquino-creek-trail-reach-3-open/#comment-19</link>
		<dc:creator><![CDATA[Ray Hosler]]></dc:creator>
		<pubDate>Sat, 27 Jun 2009 12:33:18 +0000</pubDate>
		<guid isPermaLink="false">http://rayhosler.wordpress.com/?p=364#comment-19</guid>
		<description><![CDATA[The Monroe traffic light at the staging area is operational as of Thursday, June 25.]]></description>
		<content:encoded><![CDATA[<p>The Monroe traffic light at the staging area is operational as of Thursday, June 25.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Ray Hosler</title>
		<link>http://rayhosler.wordpress.com/2009/06/12/san-tomas-aquino-creek-trail-reach-3-open/#comment-17</link>
		<dc:creator><![CDATA[Ray Hosler]]></dc:creator>
		<pubDate>Thu, 18 Jun 2009 01:45:48 +0000</pubDate>
		<guid isPermaLink="false">http://rayhosler.wordpress.com/?p=364#comment-17</guid>
		<description><![CDATA[I&#039;ve been timing my rides home. I save about 3 minutes. I can get home sooner this way even though it&#039;s 1.3 miles farther than the shorter route. On the whole, I eliminated 2 stop lights.]]></description>
		<content:encoded><![CDATA[<p>I&#8217;ve been timing my rides home. I save about 3 minutes. I can get home sooner this way even though it&#8217;s 1.3 miles farther than the shorter route. On the whole, I eliminated 2 stop lights.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: wirehead</title>
		<link>http://rayhosler.wordpress.com/2009/06/12/san-tomas-aquino-creek-trail-reach-3-open/#comment-15</link>
		<dc:creator><![CDATA[wirehead]]></dc:creator>
		<pubDate>Sun, 14 Jun 2009 04:19:29 +0000</pubDate>
		<guid isPermaLink="false">http://rayhosler.wordpress.com/?p=364#comment-15</guid>
		<description><![CDATA[Took a ride on it myself today.  It&#039;s not going to help my commute much, but it&#039;s going to help the alternate long version of my commute when I want to bike 9.8 miles instead of 5.8.

Was already discovered by the jogging and biking community.]]></description>
		<content:encoded><![CDATA[<p>Took a ride on it myself today.  It&#8217;s not going to help my commute much, but it&#8217;s going to help the alternate long version of my commute when I want to bike 9.8 miles instead of 5.8.</p>
<p>Was already discovered by the jogging and biking community.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Ray Hosler</title>
		<link>http://rayhosler.wordpress.com/2009/06/12/san-tomas-aquino-creek-trail-reach-3-open/#comment-14</link>
		<dc:creator><![CDATA[Ray Hosler]]></dc:creator>
		<pubDate>Fri, 12 Jun 2009 14:56:36 +0000</pubDate>
		<guid isPermaLink="false">http://rayhosler.wordpress.com/?p=364#comment-14</guid>
		<description><![CDATA[Trail is open. I rode it this morning, Friday. Reach 4, which goes to Cabrillo Ave. along San Tomas Expwy is being built now. It will appeal to casual cyclists and school children.]]></description>
		<content:encoded><![CDATA[<p>Trail is open. I rode it this morning, Friday. Reach 4, which goes to Cabrillo Ave. along San Tomas Expwy is being built now. It will appeal to casual cyclists and school children.</p>
]]></content:encoded>
	</item>
</channel>
</rss>
